When renovating old buildings into all-optical networks, the biggest concerns are wall demolition, business suspension and repeated cabling. The renovation plan depends on equipment ownership and the cable type buried inside walls — fiber, Ethernet cable or POF. Based on equipment ownership and cable combinations, existing buildings fall into seven typical categories: carrier four-in-one fiber access, FTTB to floors, leased FTTR-B, self-built triple-network upgrade, self-built triple-network expansion, office zones in over-10-year-old buildings, and high-EMI workshops. What to retain, replace and add for each scenario is sorted clearly below.

1. How to Define the Renovation Direction

Equipment ownership and cable types jointly decide what to keep, swap and deploy for each building.
If the equipment belongs to the carrier or is still under lease, most intermediate cables can be reused; only core-side and terminal hardware are replaced. If the network is self-built and existing services run stably, new optical branches are deployed only for new floors or new zones. Judgement starts from two points: who owns the equipment and what cables are routed inside walls, followed by link-by-link verification on site.

The AINOPOL IP-POL Boundary-Free Solution follows this principle: reuse usable old cables and replace only necessary hardware. It supports reuse of existing Ethernet cables, incoming fibers, POF cables and legacy data communication devices. A converged gateway or OLT is deployed in the equipment room, passive splitters or optical sockets are installed on floors, and one optoelectronic AP per room delivers internet, IPTV and voice services together. Traditional switches can coexist with the POL architecture and be replaced floor by floor. What customers truly need is not just the label "all-optical network", but renovation without wall breaking, zero service shutdown and full independent control afterwards.

2. Quick Reference for Seven Scenarios

Differences among the seven scenarios focus on three actions: retain, replace and add.

表格

ScenarioWhat to RetainWhat to ReplaceWhat to Add
Carrier four-in-one fiber accessIncoming fiber, building backbone, decorationCarrier splitters, four-in-one terminalsSelf-built converged gateway, passive splitters, room optoelectronic APs
FTTB to floorsIncoming fiber, floor-to-room fiber, fiber routing and connectorsFloor MDUs, legacy room terminalsSelf-built core equipment, room optoelectronic APs
Self-built triple-network functional upgradeSurvey-verified usable Ethernet cables, existing servicesLegacy AC controllers, old APs, aged end terminalsFiber trunk from core room to floors, vOLT, in-room fiber and optoelectronic APs
Self-built triple-network expansionOriginal cables, existing PBXKeep legacy system, only replace faulty unitsO-port gateway for PBX interconnection, vOLT, new PON branches, optoelectronic APs for new rooms
Leased FTTR-B (POF)POF trunk & branch cables, drop wiringLeased master gateway, original optoelectronic terminalsSelf-built core gateway, proprietary optoelectronic APs
High electromagnetic interference workshopCore equipment, machine-room-side cablesCopper drop cables inside workshopOptical trunk from equipment room to workshop, optical sockets, POF optoelectronic composite cables
Office zone in over-10-year-old buildingsCore equipment, backbone fiber, usable cable trays & conduitsOld copper cables from weak-current cabinets to workstationsOptical sockets or vOLT modules for floor switches, end-side optoelectronic composite cables

This table is for conceptual reference only. The final plan is subject to site survey and project design. One single building may fit more than one scenario. All arrangements revolve around retain, replace and add.

3. Only Three Types of Construction Actions

  • Retain: Survey-qualified optical cables, Ethernet cables, trays, conduits, weak-current cabinets, POF trunks, core switches and racks. Legacy cables and devices remain online until project acceptance.
  • Replace: Four-in-one terminals, MDUs, old AC & APs, degraded splitters and terminals, legacy copper drop cables.
  • Add: Converged gateway / OLT / vOLT, passive splitters, optical sockets, optoelectronic APs, O-port gateways, real-name authentication and log retention functions.

The "only swap two ends" approach has clear boundaries. The two ends refer to the core-side converged gateway, plus floor splitters, MDUs and room optoelectronic APs. The middle segments include incoming fiber, backbone fiber, POF and usable Ethernet cables validated by survey.


The "zero cable change" mode applies to four-in-one access, FTTB and leased FTTR-B. For self-built triple networks and old office buildings, new backbone or branch fiber will be routed along existing trays while old cables stay in service. For workshops, copper drops are replaced with optoelectronic composite cables. After migration, the hotel or campus gains full ownership and super-admin rights, with independent control over VLAN, port mapping and QoS.

4. Information Required for Site Survey

Eight sets of information collected on-site determine the scope of reusable cabling and avoid repeated visits:

  1. Equipment ownership and service contract status
  2. Cable type inside walls: fiber, Ethernet, POF or copper
  3. Availability of backbone trays and conduits for new cabling
  4. Equipment room location, power supply and cooling conditions
  5. Number of floors and endpoints
  6. Survivability of voice and IPTV when WAN fails
  7. Compliance requirements for public Wi-Fi real-name authentication and log storage
  8. Permitted construction windows and property management restrictions

Engineers further verify optical power budget, optical power deviation among terminals under one PON port, splitting ratio, port density and cable aging condition link by link.

The topology drawings provided by AINOPOL illustrate the renovation scope for each scenario for reference only, and cannot serve as construction drawings. Uncertain conditions require an on-site survey first.

To upgrade old buildings to all-optical networks, identify equipment ownership and buried cable types, then match the scenario against the quick reference table and split works into retain / replace / add. Reuse cables wherever possible and replace only necessary hardware. The AINOPOL IP-POL Boundary-Free Solution delivers wall-free renovation and transfers asset ownership and management permissions back to the owner after completion.

FAQ

Q: How do I confirm which scenario I belong to?
A: First clarify equipment ownership and the cable type in walls, then check the table. If all equipment belongs to the operator, it is most likely four-in-one fiber access or FTTB. Self-built three-service networks requiring function upgrades or room expansion correspond to triple-network upgrade and expansion cases. Book a site survey if you cannot tell.

Q: Do all seven scenarios require breaking walls?
A: Four-in-one access, FTTB and leased FTTR-B reuse all incoming fiber and POF without recabling. For self-built triple networks and old office buildings, new trunks or branches are laid along existing trays while old cables remain. For EMI workshops and aged offices, only copper drops are converted to fiber. No large-scale decoration damage will happen, while optical parameters must be validated link by link.