"Only replace devices at both ends" is a commonly heard statement for all-optical network renovation in existing buildings. However, it is not a universal practice and comes with prerequisites: usable optical fibers or POF cables are already routed inside the walls, and the existing equipment belongs to the operator or is still under lease. Only under these conditions can the middle cabling be retained and only the end devices swapped. If the prerequisites are not met, new cabling replacement or addition will be required. The key to understanding this expression lies in these sets of conditions.
To judge whether "only replacing both ends" is feasible, first check if there are reusable optical fibers or POF cables pre-installed in the walls.
The two ends refer to the converged gateway / OLT at the central office side, as well as passive splitters, MDUs and optoelectronic APs at the terminal side. "Only replace devices at both ends" means replacing these two sets of hardware with self-owned equipment, while leaving the in-wall home-run fibers, backbone optical cables, POF cables and usable Ethernet cables untouched.
Yet keeping the middle cabling unchanged has its own prerequisites: operator home-entry fiber has reached the room, or FTTB fiber has been deployed to floors and rooms, or POF main cables are already laid. Besides, the equipment must belong to the operator or stay within the lease term, so the property owner is eligible to migrate to self-managed hardware.
Scenarios where prerequisites fail are straightforward: if the in-wall cabling is legacy copper cables, or there is no reusable fiber foundation from the core room to each floor, the middle cabling cannot be saved and has to be replaced or supplemented. Therefore, "only replace both ends" cannot be applied to every project. Always check the cabling condition and equipment ownership first.
Only three scenarios satisfy the prerequisites, where no cables need to be modified and only end devices are swapped.
These three cases share the two core prerequisites above: the cabling is optical fiber or POF, and the equipment belongs to the operator or is leased. After renovation, asset ownership and super administrator privileges transfer back to the property owner. VLAN division and port mapping can be configured independently. The Mengxiang Gateway supports local real-name logging, with log retention of no less than 180 days with rolling update.
For self-built networks running on copper cables, the middle cabling cannot be kept as-is. Cable upgrade or extension is needed according to site conditions.

"Bandwidth upgrade only requires replacing devices at both ends later" refers to the optical foundation built after renovation, not the renovation stage itself.
For workshops and old office zones, terminal copper cables have to be replaced with POF, and the optical cable foundation must be laid during renovation — this step involves cabling works. Once the foundation is ready, future upgrades from Gigabit to 10G, migrating from GPON to XGS-PON, 50G PON and Wi-Fi 7 optical APs mainly rely on swapping end devices, while the middle optical fibers and splitters stay untouched.
These two interpretations of "only replace both ends" belong to different phases. One judges whether cabling can remain untouched during renovation, determined by cable type and equipment ownership before construction. The other describes convenient future upgrades after the optical foundation is completed. Mixing the two concepts may lead to misjudgment, assuming no cabling work is needed for projects that actually require cable replacement. The scope of reusable cabling for each project shall be subject to on-site survey and project design.
To sum up, verify the conditions first when hearing "only replace devices at both ends". Three scenarios with pre-installed fiber or POF and operator/leased equipment — four-in-one fiber access, FTTB fiber to floor and FTTR-B POF leasing — allow zero cabling changes. Four other cases including self-built network upgrade, capacity expansion, EMI-intensive workshops and old office zones require cable replacement or addition, with old cables kept until acceptance. "Future upgrades only swap end hardware" applies to completed optical foundations and should not be confused with renovation requirements. The AINOPOL IP-POL Boundary-Free Solution clearly defines the scope via retain, replace and add principles for accurate implementation.
Q: Can all renovation projects adopt the "only replace both ends" approach?
A: No. Only the three cases: four-in-one fiber access, FTTB fiber to floor and FTTR-B POF leasing, where fiber/POF cabling exists and equipment is operated or leased by carriers, support unchanged cabling. Self-built network upgrade & expansion, EMI-prone workshops and old office zones need cable replacement or supplementation, with legacy cables retained until acceptance. Final plan depends on on-site survey.
Q: Which two ends are being replaced?
A: The central office end consists of converged gateways / OLTs in the core computer room. The terminal end covers floor passive splitters, MDUs and room optoelectronic APs. The in-wall home-run fiber, backbone fiber, POF and usable Ethernet cables fall into the "retain" category, on condition that they pass field verification.
Q: Is "only replace both ends for future upgrades" the same as "only replace both ends during renovation"?
A: No. The former means after the optical foundation is deployed, future bandwidth upgrades mainly swap end devices without touching middle cabling. The latter describes whether cabling work can be skipped during renovation, determined by pre-existing cable type and equipment ownership. Workshop and old-building renovations require copper-to-POF conversion at terminals, yet they can benefit from the easy upgrade model once the optical base is ready.