What Exactly Is Involved in All-Optical Network Renovation? How to Understand the Phrase "Only Replace Devices at Both Ends"
2026-11-20 13:45:52 6

What Exactly Is Involved in All-Optical Network Renovation? How to Understand the Phrase "Only Replace Devices at Both Ends"

"Only replace devices at both ends" is a commonly heard statement for all-optical network renovation in existing buildings. However, it is not a universal practice and comes with prerequisites: usable optical fibers or POF cables are already routed inside the walls, and the existing equipment belongs to the operator or is still under lease. Only under these conditions can the middle cabling be retained and only the end devices swapped. If the prerequisites are not met, new cabling replacement or addition will be required. The key to understanding this expression lies in these sets of conditions.

1. Prerequisites for This Statement to Apply

To judge whether "only replacing both ends" is feasible, first check if there are reusable optical fibers or POF cables pre-installed in the walls.

The two ends refer to the converged gateway / OLT at the central office side, as well as passive splitters, MDUs and optoelectronic APs at the terminal side. "Only replace devices at both ends" means replacing these two sets of hardware with self-owned equipment, while leaving the in-wall home-run fibers, backbone optical cables, POF cables and usable Ethernet cables untouched.

Yet keeping the middle cabling unchanged has its own prerequisites: operator home-entry fiber has reached the room, or FTTB fiber has been deployed to floors and rooms, or POF main cables are already laid. Besides, the equipment must belong to the operator or stay within the lease term, so the property owner is eligible to migrate to self-managed hardware.

Scenarios where prerequisites fail are straightforward: if the in-wall cabling is legacy copper cables, or there is no reusable fiber foundation from the core room to each floor, the middle cabling cannot be saved and has to be replaced or supplemented. Therefore, "only replace both ends" cannot be applied to every project. Always check the cabling condition and equipment ownership first.

2. Three Eligible Scenarios: Truly Only Replace End Devices

Only three scenarios satisfy the prerequisites, where no cables need to be modified and only end devices are swapped.

  • Hotel fiber access with four-in-one terminals: Home-run fibers and backbone links remain unchanged or receive minor adjustments. The original operator splitter is replaced with a self-owned passive splitter, and room terminals are upgraded to optoelectronic APs, with no new cabling routed to guest rooms.
  • Hotel FTTB fiber to the floor: Home-run fibers, existing floor-to-room optical cables and backbone cabling are fully retained. Floor MDUs are replaced in situ without altering cable joints or routing paths, and optoelectronic APs are deployed in rooms.
  • FTTR-B (POF) leased networks for enterprises, factories and industrial parks: All pre-laid POF main cables, branch lines and outlet cabling are reused. The leased master gateway is replaced with self-owned core room hardware and optoelectronic APs, and self-managed equipment is connected at both ends of the POF links.

These three cases share the two core prerequisites above: the cabling is optical fiber or POF, and the equipment belongs to the operator or is leased. After renovation, asset ownership and super administrator privileges transfer back to the property owner. VLAN division and port mapping can be configured independently. The Mengxiang Gateway supports local real-name logging, with log retention of no less than 180 days with rolling update.

3. Four Ineligible Scenarios: Cable Replacement or Addition Required

For self-built networks running on copper cables, the middle cabling cannot be kept as-is. Cable upgrade or extension is needed according to site conditions.

  • Upgrade of legacy separated self-built triple-play networks: Equipment is replaced alongside partial cabling. Optical cables are deployed from core room to floors, and new fiber runs from floors to rooms. Verified usable Ethernet cables are kept, while old telephone and TV cables are phased out gradually during cutover.
  • Capacity expansion of separated self-built triple-play networks: The legacy system remains fully operational. Optical infrastructure is only added in new zones. O-port gateways are deployed in the core room to interconnect with original program-controlled equipment, along with vOLT / OLT hardware. New optical cables and splitter branches are laid for new floors and rooms. Original cabling is fully preserved, and old and new networks run in parallel in separate zones.
  • Workshops with heavy electromagnetic interference: Copper cables running to terminals inside the workshop are replaced. New optical cables are deployed from the computer room to the workshop, alongside optical sockets in telecommunication closets and POF optoelectronic composite cables for terminal outlets. Core hardware can be retained if usable.
  • Office zones in office buildings or factories over ten years old: Core equipment and backbone optical cables from core room to floor telecommunication closets are reused wherever possible. Optical sockets or vOLT modules are added to legacy switches in weak-current rooms. Old copper cables from telecommunication closets to office outlets are replaced with optoelectronic composite cables, without expanding cable trays or large-scale wall demolition. A single POF segment supports up to 800 meters without repeaters; standard optical fiber serves as backbone, and POF is only used for terminal connections.

4. Another Meaning of "Only Replace Both Ends": Future Network Evolution After Renovation

"Bandwidth upgrade only requires replacing devices at both ends later" refers to the optical foundation built after renovation, not the renovation stage itself.

For workshops and old office zones, terminal copper cables have to be replaced with POF, and the optical cable foundation must be laid during renovation — this step involves cabling works. Once the foundation is ready, future upgrades from Gigabit to 10G, migrating from GPON to XGS-PON, 50G PON and Wi-Fi 7 optical APs mainly rely on swapping end devices, while the middle optical fibers and splitters stay untouched.

These two interpretations of "only replace both ends" belong to different phases. One judges whether cabling can remain untouched during renovation, determined by cable type and equipment ownership before construction. The other describes convenient future upgrades after the optical foundation is completed. Mixing the two concepts may lead to misjudgment, assuming no cabling work is needed for projects that actually require cable replacement. The scope of reusable cabling for each project shall be subject to on-site survey and project design.

To sum up, verify the conditions first when hearing "only replace devices at both ends". Three scenarios with pre-installed fiber or POF and operator/leased equipment — four-in-one fiber access, FTTB fiber to floor and FTTR-B POF leasing — allow zero cabling changes. Four other cases including self-built network upgrade, capacity expansion, EMI-intensive workshops and old office zones require cable replacement or addition, with old cables kept until acceptance. "Future upgrades only swap end hardware" applies to completed optical foundations and should not be confused with renovation requirements. The AINOPOL IP-POL Boundary-Free Solution clearly defines the scope via retain, replace and add principles for accurate implementation.

FAQ

Q: Can all renovation projects adopt the "only replace both ends" approach?
A: No. Only the three cases: four-in-one fiber access, FTTB fiber to floor and FTTR-B POF leasing, where fiber/POF cabling exists and equipment is operated or leased by carriers, support unchanged cabling. Self-built network upgrade & expansion, EMI-prone workshops and old office zones need cable replacement or supplementation, with legacy cables retained until acceptance. Final plan depends on on-site survey.

Q: Which two ends are being replaced?
A: The central office end consists of converged gateways / OLTs in the core computer room. The terminal end covers floor passive splitters, MDUs and room optoelectronic APs. The in-wall home-run fiber, backbone fiber, POF and usable Ethernet cables fall into the "retain" category, on condition that they pass field verification.

Q: Is "only replace both ends for future upgrades" the same as "only replace both ends during renovation"?
A: No. The former means after the optical foundation is deployed, future bandwidth upgrades mainly swap end devices without touching middle cabling. The latter describes whether cabling work can be skipped during renovation, determined by pre-existing cable type and equipment ownership. Workshop and old-building renovations require copper-to-POF conversion at terminals, yet they can benefit from the easy upgrade model once the optical base is ready.