
Policy support for old residential community renovation is ramping up in 2026. Zhang Zhiyong, NPC Deputy and Chairman of China Tower, proposed during the Two Sessions: "Treat communication coverage infrastructure in key areas such as elevators and underground parking lots as mandatory items for old community renovation." He also suggested "actively promoting Fiber to the Room (FTTR) technology and unifying standards for concealed cabling and integrated low-voltage box retrofits."
Guangdong took the lead and clearly stated: "Further advance the renewal and renovation of outdated communication facilities, achieving full FTTR whole-home optical network coverage for both new and old residential communities simultaneously." Henan also specified: "Support FTTR deployment during the construction of new buildings and renovation of legacy structures." The Ministry of Industry and Information Technology issued the 15th Five-Year Plan for the Development of the Information and Communications Industry, mandating "renewal and transformation of communication network infrastructure in resource-depleted cities, old urban areas and rural regions."
During the 15th Five-Year Plan period, cumulative investment in information infrastructure will hit 3.8 trillion RMB. Over 50,000 old residential communities are scheduled for renovation nationwide, of which more than 60% involve low-voltage pipe network remediation, directly driving roughly 300 billion RMB in related investment.
Funding, policies and standards are all in place — what remains is the manpower to deliver the projects.
New construction projects come with complete drawings, built from scratch and implemented strictly per design specifications. Legacy renovation means entering outdated low-voltage closets, facing tangled cables with unknown origins and endpoints, and designing new optical paths within constrained spaces.
Old community renovation has several hard constraints: no large-scale demolition, no prolonged network outages, limited budgets and complex on-site conditions.
Traditional switch-plus-network-cable solutions keep hitting barriers under these constraints:
The strengths of all-optical networks precisely address these pain points. Fiber cables are only a few millimeters in diameter and can easily pass through old conduits without massive civil demolition. Fiber supports transmission distances up to 20 km, requiring merely one or two low-voltage closets per building. All-optical networks use passive optical splitters, which require no power supply or heat dissipation and deliver nearly zero failures.
AINOPOL’s all-optical legacy reuse renovation solution adopts standardized construction workflows including site surveys, pipeline cleaning, fiber core replacement and route reuse. It enables stable all-optical upgrades without large-scale civil engineering demolition. For old residential community retrofits, all-optical networking is not merely an optional choice, but the optimal solution.
Policies are ready and solutions mature, yet many integrators remain hesitant. It is not a lack of willingness, but uncertainty about how to get started.
These bottlenecks boil down to one core question: how much technical backing can the manufacturer provide?
AINOPOL takes concrete actions tailored to renovation scenarios.
No stocking pressure, no advance capital outlay. Renovation projects have longer payment cycles than new builds. AINOPOL enforces 18 rigid red lines including "no mandatory stocking". Purchases are only triggered upon confirmed projects, with no inventory kept without orders. Standard orders adopt cash-on-delivery terms and will not tie up your cash flow.
Yancheng, Bengbu, Chongqing, Henan — communication renovation projects for old residential communities are evolving from policy documents into public bidding announcements. Orders for retrofits are already on the way.
Simply put, system integrators follow project opportunities. Where policies lead, projects follow; where standards are defined, orders emerge. This legacy market of old community renovation boasts far larger volume and greater sustainability than new construction projects.
Now is not the time to wait and watch. Prepare your all-optical renovation capabilities so you can take on projects when they are released in large volumes.
That’s it.
Q: What is the difference between legacy renovation and new-build projects?
A: New construction starts from scratch with complete drawings and standards. Renovation requires construction without service interruption, handling complex site conditions and interfacing with legacy systems. Thanks to its slim fiber size, long transmission range and passive architecture, all-optical networking is the optimal solution for legacy retrofits.
Q: Do I need to stock inventory for legacy renovation projects?
A: No. The formal cooperation model supports zero inventory and purchase-on-demand. Procurement is only made when a project is secured.
Q: Can integrators without all-optical renovation experience deliver these projects?
A: Yes. AINOPOL provides end-to-end technical support from survey assistance and solution design to equipment commissioning and after-sales O&M. You do not need to maintain an in-house all-optical technical team; your focus remains on client communication and on-site coordination.